Smart Services

From DP-RAIL Wiki
Revision as of 16:27, 18 March 2021 by Dsc (talk | contribs)
Jump to navigation Jump to search

The Smart Services encompass future, advanced functionality based on existing basic services amended by new integrating and advanced logic to build a new innovative service offer. The list below was collected along the analysis sessions in phase 1 of this project.

  1. SM_01 √ Optimize Asset Utilization
  2. SM_02 Maintenance Requirements
  3. SM_03 Damage Information
  4. SM_04 Train Harmonization Service
  5. SM_05 End-To-End Path Planning/Ordering
  6. SM_06 End-To-End Transport Planning
  7. SM_07 Capacity Optimization
  8. SM_08 Siding Everywhere
  9. SM_09 Low Entry Barrier for Transport Offerings
  10. SM_10 Seamless Track and Trace
  11. SM_11 Automated Shunting
  12. SM_12 Intermodal Alignment
  13. SM_13 √ Share Free Capacity
  14. SM_14 Railway Starter Package
  15. SM_15 Intermodal Connectivity Package
  16. SM_16 Intelligent Wagon routes autonomously
  17. SM_17 Facilities on location
  18. SM_18 Navigation service for railways
  19. SM_19 Train run based data intelligence
  20. SM_20 Observe Train Run
  21. SM_21 * GPS triggered TRI
  22. SM_22 * WDI Enhancement for Last Mile
  23. SM_23 * TelematicData of Wagon
  24. SM_24 * Authority Communication
  25. SM_25 * Port Terminal Communication.