Railway Starter Package

From DP-RAIL Wiki
Jump to navigation Jump to search

Summary

Railway Starter Package is also called Rail Solution Suite

Digital Consignment Note

Creation and handover of consignment notes (CNs) often a manual and cumbersome process. Documents’ check on paper between small and large RUs and ports, terminals. ​

All RUs use 100% standardized digital consignment notes (CNs) that are available via API to partner RUs. Creation and handover of CNs can be done by mobile user-friendly interfaces - especially for small RUs.​

Digital Train Composition

Different train composition message in RU/RU versus RU/IM communication. Variants in messages due to national dialects. Time consuming and manual solution for small RUs ​

A standardized train composition message created via mobile app or available via API in which national dialects can be handled automatically​

Digital Train Operation

No/little integration of small RUs in the train processing. Information on first and last mile mostly handed over manually. ​

Small RUs, Terminals, Ports and operative staff use a mobile app and web portal to pull and push Train Run Information. Border crossings and handover of trains - document check, customs - are conducted digitally based on train file and support a seamless train run through Europe.​


Description

The Railway Starter Package is the central entry point for railway undertakings for participating in the RFF Eco System.

The aim of this package is to

  • (commercial) align on the smart services which are subscribed by a railway undertaking (type A, B and C)
  • configure the railway undertaking in the RFF Eco System
  • provide all technical API documentation and administrational information which enables the railway undertaking to access (or contribute to) the subscribed smart services which are exposed by the RFF Eco System

Use Case

Preconditions

Basic Services

SM22 WDI Enhancement for Last Mile

Dependencies

Planned Steps

WDI2.0 (WSM and Hermes30 for small RUs)

WDI Roadmap.png

Evaluation

  • Frank Kschonsak on 25 June

CN, train composition and operational/running information up to the last mile, based on standardized API are indeed part of the basic information set.